| From welding of carbon steel to exotic materials, welding as per your specifications. The fabrication department occupies over 97,000 square feet of floor space. | PREPARATION | WELDING PROCESSES | | Water jet cutting: 8’ x 20’ table | FCAW GTAW SMAW | | Cutting press: maximum 1" thick | GMAW SAW | | Forming press: maximum 500 tons | | | Forming rolls: maximum 1-1/4" thick | | | WELDING | CRANES | | Submerged arc: maximum 240" x 240" | 50 tons | | Positioners: maximum 12 tons | | |